
Consulting
Design management systems and improve the processes your teams use every day.
Explore consulting
Discuss your project ↗
Design management systems and improve the processes your teams use every day.
Explore consulting →
Assess supplier, production and management system controls using evidence from actual work.
Explore auditing →
Build practical skills in management systems, internal auditing and team development.
Explore training →Use the Sakhi Knowledge Centre to plan an audit, compare management systems or build an evidence checklist.
Explore the Knowledge CentreSee Sakhi training and workshops on management systems, supplier quality, sustainability and team development.
Explore Sakhi’s articles on consulting, auditing and training. For step-by-step guides and worked examples, visit the Knowledge Centre.
Prepare for a Maruti VSA or other customer supplier assessment by tracing one live part from the customer requirement to the production control and shipment record. Use the buyer’s current assessment criteria to set the scope and use IATF 16949 tools to test whether that control works in production.

Start with the current buyer-issued checklist and customer-specific requirements for the site, commodity and project. Ask the buyer to confirm the scope if it is unclear. Assign an owner to each major topic. Sample a recent shipment, a changed part and an abnormal condition instead of preparing a file of blank forms. For each sample, capture the part number, revision, lot, date, record owner and how a reviewer can retrieve the record. Close the gap by running a second sample after the fix.
Advanced Product Quality Planning (APQP) connects launch milestones with design and manufacturing work. Process Failure Mode and Effects Analysis (PFMEA) identifies what might go wrong and where controls matter. The control plan tells production what to check, how often and what to do when a limit is breached. Production Part Approval Process (PPAP) provides agreed evidence for customer approval. Follow a single characteristic through the process flow, PFMEA, control plan and shop-floor instruction. A revision mismatch across those documents is a signal to inspect recent production and confirm customer notification requirements.
Log the change and identify the affected part numbers, lots, tooling, process sites and external providers. Decide which validations must be repeated and whether the customer needs notice or approval before release. Update the control plan, operator instructions and measurement setup together. Release the change after the authorised person signs off, then review the first production lots for evidence that the new controls work.
A bracket supplier moves a welding fixture to a second line. The inspection form has the same part number, but the plan on the second line still references the old gauge revision. The team identifies the affected lots, pauses release where appropriate, checks the gauge against the approved inspection method, and agrees next steps with the customer if required. For the new line, retain the approved revision, evidence from the first validated lots and sign-off from the process owner.
For a supplier process audit, pick a lot made just after a tool or product changeover. Compare the first-off approval, setup settings and measurement records against the current control plan. Follow the same lot through release and shipping to see whether the records tell a consistent story.
Record the part and revision, line, shift, changeover time and first lot released. Ask the operator to explain the restart and what would trigger a hold.
Use a training record to walk through an out-of-limit reading. Identify who would stop the process, how the last known acceptable check sets the review boundary and who can authorise release.
If a second sign-off was missing, verify the next comparable changeover on a different shift. Record the relevant lot, approver and time so a second reviewer can reproduce the check.
| Focus | What to check | Evidence or decision |
|---|---|---|
| Customer and drawing revision | What to checkCurrent buyer instructions with scope and revision | Evidence or decisionSales or quality confirms the latest revision |
| Special characteristic | What to checkSame characteristic appears in PFMEA, control plan and instruction | Evidence or decisionProduction demonstrates the reaction plan |
| Lot release | What to checkApproved measurement method, traceability, release record | Evidence or decisionQuality traces a finished lot to inputs and checks |
A customer may still run its own audit. Confirm its current criteria, applicable customer-specific requirements, and which site and process are in scope.
Measure the result after the permanent action under comparable conditions. Include a recurrence check on similar parts, lines or failure modes where the cause could also exist.
Start with a time-stamped setup check, first-off result and transfer to the production release record. A useful sample also shows the approved document revision and the person who released the lot.
Ask Sakhi to trace the link between the buyer’s requirements, your control plan and evidence from a recent lot.
2026 © www.isoconsultants.in. All Right Reserved. | Website Design Company in India Maitrix Infotech
WhatsApp us