A useful carbon inventory ties every reported value to its boundary, unit, source and approval. Indian exporters should establish product and installation records for CBAM alongside their corporate inventory, because each purpose uses a different boundary and calculation method.

Industrial engineering setting
  1. Define the reporting boundaryOrganisation, installation, product and period
  2. Reconcile the numbersMeter data, output, supplier evidence and factor versions
  3. Review the declarationPurpose, method, reviewer and retained calculation

Implementation guidance

How do you build a traceable Scope 1, 2 and 3 inventory?

Choose the organisational boundary and reporting period before collecting data. Scope 1 covers direct emissions from sources within the chosen boundary. Scope 2 addresses indirect emissions from purchased energy. Scope 3 captures relevant upstream and downstream value-chain categories. Keep each activity value, unit, emission factor, factor version and calculation together. Request evidence or explain estimation methods where data are incomplete. A corporate tonne of CO₂e only has meaning alongside its boundary and reporting period.

What can an Indian exporter prepare for EU CBAM?

Confirm product classification and applicability with the EU importer. For in-scope goods, identify the relevant producing installations and production routes, then collect period-specific output, activity data and precursor evidence under the applicable EU methodology. The definitive regime began on 1 January 2026. Parties should confirm the latest obligations, verification rules and templates using the Commission’s current guidance. A corporate GHG inventory is useful as a data source. Product-level embedded emissions still require the applicable boundaries and attribution method.

How do you prepare sustainability reporting evidence?

Build a register that ties each disclosed metric to a site or entity, measurement system, definition and reviewer. Agree how to handle estimations, units, missing months and restatements before submitting figures. For a sustainability questionnaire, check which metrics are mandatory and which cover the supplier’s own operations. For BRSR or BRSR Core, check the latest applicable SEBI circulars and scope before setting the reporting rules.

Worked example

A plant electricity bill is not a product figure

An illustrative metalworking plant records 120 MWh for the reporting month and 600 tonnes of total production. The plant-wide ratio is 0.20 MWh per tonne. That ratio tells the site how overall energy compares with output. Before using data for a product estimate, the team checks whether different product lines share equipment, which meters cover which stages and which allocation rules apply. Product attribution and CBAM-specific treatment require documented support.

Build a reproducible electricity emissions calculation

A Scope 2 electricity working paper should let a reviewer go from the reported total to the individual meter periods, consumption and emissions factor. Keep the location-based calculation identifiable and label any market-based calculation under the applicable reporting method.

  1. Reconcile the activity data

    Record site, account or meter ID, bill period and kWh. Investigate duplicate invoices, estimated readings and gaps created by a site opening or an account transfer.

  2. Record the arithmetic and factor

    For illustration only, 25,000 kWh multiplied by a hypothetical 0.70 kg CO₂e per kWh equals 17.5 tonnes CO₂e. For reporting, log the appropriate factor source, geography, year and unit.

  3. Check boundary changes

    Keep a note for shared facilities and document the allocation basis. Have a second reviewer recompute a sample month and record any estimate that needs replacement once supplier data arrives.

Evidence checklist

FocusWhat to checkEvidence or decision
Activity valueSource reading and unitMeter, invoice, production log or supplier evidence
Emission factorValue, unit, source and vintageVersion used and calculation check
Reported figureBoundary and reviewerReconciliation, approved method and exception notes

Common questions

Can Scope 3 numbers be added directly to CBAM embedded emissions?

Use the specific CBAM calculation rules. Corporate Scope 3 categories and CBAM’s goods-level boundaries address different reporting purposes.

What should a supplier share first when emissions data are incomplete?

Share the known period, facilities and data coverage with the requester. Mark estimates and missing records explicitly, then agree a follow-up plan with the responsible parties.

What should you retain for a Scope 2 audit trail?

Keep the electricity records, meter or site mapping, calculation version, emissions-factor source and approvals. Document estimates and allocation decisions in terms another reviewer can reproduce.

Apply this guidance with Sakhi

Bring the buyer’s reporting request or a sample data file. Sakhi can help define the boundary, identify data owners and organise the review trail.

Open enquiry form

Our Inspiration

Mata Ji
Quote Icon Guru Maa Ji Quote Icon

Information

Enquiry Now

    2026 © www.isoconsultants.in. All Right Reserved. | Website Design Company in India Maitrix Infotech

    × How can I help you?